Ohio Healthcare System Saves Over 40 Hours with ES83 Haze Away
With ES83 Haze Away, the hospital system was able to save about 40 – 50 hours across the three hospitals in labor costs due to the speed of use. With the potential future additions of the other five hospitals, the total time savings could be close to 120 hours per week.
A Guide to Keeping Your Delivery Drivers Safe in the Winter
Winter driving can be tricky and extremely dangerous, but there are ways to ensure your drivers are safe. FlexPAC cares about safety and hope that this information helps you prepare your workplace, home and drivers for the hazards of winter weather.
A Guide to Keeping Your Outdoor Workers Safe in the Winter Weather
Preparing for winter weather doesn’t cross our minds until the first cold snap. Every year, many people are injured or even die because the winter weather catches us off guard. Taking a few minutes to think about cold weather safety may be the difference between surviving a winter emergency and becoming a statistic.
FlexPAC Creates Custom Machine to Save Manufacturing Process
An entirely new. custom machine created within the timeframe given saved the manufacturer on costs in numerous areas and exceed the customer’s expectations.
3PL Geodis Saves 25% on Packaging Supplies by Consolidating
It costs $700-$1,400 per year to maintain one vendor relationship. With 4+ vendors, vendor consolidation will have a yearly savings of $2,400-$5,600.